Our Story
How Our Concrete Estimators Help Baltimore Contractors Win More Bids
Baltimore's Johns Hopkins expansions, port projects, and large stock of rowhouses needing rehabilitation bring a steady mix of institutional and renovation work. That's the market we estimate for every day, building concrete takeoffs for projects from Johns Hopkins medical and research facilities to rowhouse rehabilitation.
Near the water in Baltimore, pile caps, grade beams, and elevated slabs come with marine-exposure specifications, and our takeoffs carry those mix and rebar requirements by element. Infill sites in the area often mean underpinning neighboring buildings, demolishing existing slabs, and pouring new foundations in tight spaces.
Our concrete estimators use Bluebeam Revu, PlanSwift, and Kubla Cubed to build each Baltimore takeoff, and they read the drawings with the IBC and IRC editions adopted by Baltimore in mind, including rebar cover, lap lengths, footing depths, and special-inspection items. You receive an Excel workbook and marked-up PDFs, so every concrete number can be checked.
With a 98% bid-hit ratio across more than 5,000 U.S. projects, Remote Estimation gives Baltimore contractors professional concrete estimating capacity without the cost of an in-house department, and we work the same way for firms in nearby Towson and Columbia. Get a fixed quote for your next Baltimore bid within about an hour.