Our Story
Sitework Takeoff & Estimating Built for Brooklyn Contractors
Brooklyn ranges from 40-story Downtown towers to 120-year-old brownstones, and Gowanus and the waterfront add flood-resistant construction and environmental cleanup to the scope. Whether you're bidding Gowanus rezoning projects or brownstone gut renovations, our sitework estimators build quantities from your drawings, not from rules of thumb.
Sitework for Brooklyn's dense urban projects means deep excavation, support of excavation, dewatering, contaminated soil handling, and tight trucking logistics. We quantify excavation by soil type and disposal method. Utilities in the area have to be buried below the frost line, and our takeoffs carry those depths.
Each takeoff is built in Kubla Cubed, AGTEK, Bluebeam Revu, and PlanSwift from your current plan set and checked against the NYC Construction Codes, including stormwater management, erosion control, and utility separation requirements. New York City costs such as DOB NOW filings, sidewalk sheds, hoisting, and Local Law 97 upgrades are called out separately when they apply. Sitework quantities are organized by area, floor, and system to match how Brooklyn contractors actually bid.
Remote Estimation has prepared estimates on more than 5,000 projects for 500+ contractors, and that experience goes into every Brooklyn sitework bid we touch. We can price sitework labor at union, prevailing-wage, or open-shop rates. City-funded work in the five boroughs is priced at the NYC Comptroller's prevailing wage schedules, and much private work here is built with union crews. Request a quote today, and your first estimate comes with 10% off.