Our Story
Philadelphia Data Center Construction Estimates Your Bids Can Rely On
Philadelphia combines rowhouse rehabilitation, University City life-sciences labs, and Navy Yard redevelopment, and union labor rates and older structures shape most estimates. Whether you're bidding rowhouse rehabilitation or the Navy Yard redevelopment, our mission-critical estimators build quantities from your drawings, not from rules of thumb.
Philadelphia's cooler climate allows economizer-based cooling for much of the year, which changes mechanical scope. We price free-cooling systems and winterization. Data center work in dense local often means fitting critical infrastructure into existing buildings: multi-story colocation, structural reinforcement for floor loads, and rooftop or vault equipment.
Under Philadelphia's amended building code, small details add up: fire protection, electrical safety, and energy-efficiency requirements. We catch them during the data center construction takeoff instead of after the award. Measurements are done in Bluebeam Revu, PlanSwift, and Trimble Accubid and summarized in Excel for your bid.
Remote Estimation has prepared estimates on more than 5,000 projects for 500+ contractors, and that experience goes into every Philadelphia data center construction bid we touch. Labor assumptions for the data center construction scope are yours to choose: union, prevailing wage, or open shop. Pennsylvania's Prevailing Wage Act applies to public projects over $25,000, with rates set by the Department of Labor & Industry. Get a fixed quote for your next Philadelphia bid within about an hour.