Our Story
How Our Lumber and Framing Estimators Help Detroit Contractors Win More Bids
Detroit's Corktown and Michigan Central redevelopment, automotive plant retooling, and downtown adaptive reuse are driving the city's largest building cycle in decades. That's the market we estimate for every day, building lumber and framing takeoffs for projects from Corktown and Michigan Central redevelopment to downtown tower projects.
Wood framing in Detroit's denser areas usually means four to five stories of wood over a concrete podium. These buildings use stacked shear walls, continuous rod tie-downs, shrinkage-compensation devices, and fire-rated assemblies. We count each one, along with studs, plates, and sheathing. Energy-code requirements in the area often push framing to 2×6 walls, advanced framing, or continuous exterior insulation, which changes stud counts, sheathing, and fasteners.
Under the Michigan Building Code, small details add up: nailing schedules, connector requirements, shear walls, and energy-code wall assemblies. We catch them during the lumber and framing takeoff instead of after the award. Measurements are done in PlanSwift, Bluebeam Revu, and Buildertrend and summarized in Excel for your Detroit bid.
Remote Estimation has prepared estimates on more than 5,000 projects for 500+ contractors, and that experience goes into every Detroit lumber and framing bid we touch. Labor assumptions for the lumber and framing scope are yours to choose: union, prevailing wage, or open shop. Michigan reinstated its prevailing wage law for state-funded projects in 2024. Email your plan set to info@remoteestimation.us for a fixed lumber and framing quote.