Our Story
Lumber and Framing Takeoff & Estimating Built for Syracuse Contractors
Micron's planned megafab in Clay and the I-81 viaduct replacement are bringing a once-in-a-generation wave of housing, retail, and supplier work to Central New York. That's the market we estimate for every day, building lumber and framing takeoffs for projects from Micron semiconductor megafab in nearby Clay to Syracuse University construction.
Framing in older Syracuse homes means sistering joists, replacing rot, adding headers for new openings, and framing additions onto out-of-square structures. We separate repair from new framing. Cold-climate walls in the area use deeper studs and exterior insulation, so our lumber takeoffs follow the specified assembly.
Projects in Syracuse are permitted under the New York State Uniform Fire Prevention and Building Code, so we follow the code-driven notes on your drawings (nailing schedules, connector requirements, shear walls, and energy-code wall assemblies) and carry them into the takeoff. Our team uses PlanSwift, Bluebeam Revu, and Buildertrend to measure and organize every lumber and framing quantity.
With a 98% bid-hit ratio across more than 5,000 U.S. projects, Remote Estimation gives Syracuse contractors professional lumber and framing estimating capacity without the cost of an in-house department, and we work the same way for firms in nearby Clay and Cicero. We can price lumber and framing labor at union, prevailing-wage, or open-shop rates. New York's prevailing wage schedules apply to public work statewide, and certain privately built projects with significant public funding now follow them as well. Share your plans and scope, and we'll send a fixed quote within an hour.